QAwork Tour

A visual walk-through of how QAwork looks in practice, with separate flows for testers and admins inside the same project.

Demo Flow

Pick a role and view the full project flow in screenshot-style scenes. This is a mock walkthrough, not a live project.

Admin walkthrough

See how a QA lead prepares the project, shapes the checklist, opens the active run, manages the team, and still uses test execution when needed.

1. Create or open the right project space

Every project has its own users, checklists, settings, link base, and report visibility, so client work does not leak into another workspace.

Project Space
Client QA /client-qa Admin

2. Start with Checklist Builder With AI when you want a more accurate first draft

The AI builder is better when the admin wants a faster and more precise first structure for the checklist, scenario, test title, description, and expected result, while still keeping full manual control over the final wording. If needed, the admin can also skip AI completely and create everything manually from the start.

Checklist Builder With AI
AI wizard
2 step

Who usually uses this functionality?

Client Admin Both
3 step

What does the user want to do?

Test Draft Preview
ChecklistAdmin
ScenarioCatalog
Test titleManage product details
Description
Expected result
Optional negative checks
Related link
Use AI suggestion Edit wording Add one more test Or build manually

3. Open the active run in Planning Control

The admin creates a run, reviews unplanned tests, and attaches the right scope so testers only see what belongs to the current execution cycle.

Planning Control
Plan QA_01_05_2026
Onboarding scenarioAdd To Plan
Wallet scenarioAdd To Plan
Purchase scenarioAlready Planned
Returns scenarioAdd To Plan

4. Manage testers and access in Team Access

The admin adds testers, disables accounts when needed, and keeps project access clean without touching other projects.

Team Access
Dana TesterActiveTester
Mark QAActiveTester
Project AdminActiveAdmin

5. Test like a tester when validation is needed

The admin still uses Test Execution in the same focused way as a tester, updating only environment statuses instead of editing structure there.

Test Execution
Android Phone APKPASSLast Tested: Admin
iPhone AppIN QALast Tested:Not updated yet
Windows ChromePASSLast Tested: Dana

6. Track follow-up work from each test

The QA lead can keep bugs tied to the exact test case. Jira-linked tickets sync back into QAwork, and solved Jira tickets stop increasing the open bug counter; teams without Jira can stay fully inside the internal tracker.

Issues Control
Admin can create a tester account Issues remain attached to the source test. Issues 2
Internal tracker
Bug: invite email does not arrive Medium
Jira integration
WAP-10071 Solved
Sync Jira Statuses Solved open counter updates
If Jira says Solved, QAwork moves that ticket out of the open test bug count.

7. Open Analytics and see the run status

The admin reviews the same report logic as the tester, while using it to monitor scope, regressions, risk, trends, and optional sprint visuals across the whole run.

Analytics
Planned50
Executed41
Coverage82%
Pass Rate76%
Regression2
Environments6
Statistics per Functional Vertical
Vertical
Planned
Executed
Regression
Risk
CORE
15Total
12Passed
1Failed
HighRisk
USER
10Total
8Passed
0Failed
MedRisk
ADMIN
25Total
21Passed
1Failed
MedRisk
Statistics per Functional Vertical
VerticalPlannedExecutedRegressionRisk
CORE15121High
USER1080Med
ADMIN25211Med
Trends Summary per Vertical
Environment Execution Summary
EnvironmentExecutedPass Rate
Android Phone Chrome6100%
iPhone App450%
Product Stability Summary
IndicatorCurrentTarget
Coverage82%>= 85%
Pass Rate76%>= 90%
Regression4.9%<= 5%

Why teams use QAwork

QAwork keeps planning, execution, and reporting connected in one workspace instead of scattering the process across disconnected sheets and status updates.

Less confusion

One shared project flow makes it easier to know what should be tested now, what is still open, and what belongs to each team member.

Better prioritization

Risk, priority, and checklist structure help the team decide what to run first when release time is short.

Faster updates

Saved results update the report directly, so stakeholders can see progress without waiting for someone to rebuild a summary manually.

Closed and guided

QAwork is a closed platform. Project creation and access are managed intentionally, and support is available at [email protected].